Environmental protection at Lünen

With a production capacity of up to 230,000 t of copper cathodes per year, the plant, which is just one kilometer away from Lünen Town Hall, is one of  the world’s largest secondary copper smelters. Around 650 employees produce copper anodes, copper cathodes, iron silicate sand, and a variety of co-products here on the 316,000 m³ premises.

The site has capabilities for flexible secondary raw material use and, as a multimetal recycling site, is able to process highly complex raw materials in its own smelting and refining processes.

Besides traditional materials such as copper scrap and alloy scrap, sludges and industrial residues, recycling raw materials also include materials with complex compositions such as reprocessing fractions from electrical scrap and end-of-life vehicles as well as waste incineration ashes.

Improvements and investments in environmental protection are also of great importance in Lünen. Around € 130 million has been invested in environmental protection since 2000.

With the commissioning of the Kayser Recycling System at the Lünen site in 2002, Aurubis became one of the world's largest copper recyclers and set new standards in environmental protection with exemplary character.

In the subsequent years, many more investments were made in environmental protection, especially to reduce fugitive emissions in the metallurgical facilities and in the storage and handling of input materials.

But the Lünen site is continuously developing its approach to water as well. The facility for water retention, treatment and use of surface water — abbreviated as the RAN facility — operated with a total investment volume of around € 4.5 million enables more than 100,000 m³ of treated rainwater to be used for internal purposes as process water and thus saved every year. The plant is improved continuously. Optimized water collection and delivery has already reduced the amount of water withdrawal by 50 % compared to 2019. To further improve sustainable water use, new optimizations of internal water use are planned for the Lünen site in the coming years as part of a water concept. The aim is to use all water internally as far as possible and to avoid discharging wastewater into the public sewer system.

The efficient use of natural resources such as water has been part of Aurubis' corporate culture for many years and is also an important part of ecological and economic responsibility for the Lünen site.

The efficient use of natural resources also includes energy and the reduction of CO emissions. Innovative projects to increase energy efficiency ensure highly efficient and flexible power generation from waste heat at the Lünen site by means of cogeneration via a two-stage condensing turbine. Up to 23 million kWh of electricity (around 14 % of the site's electricity requirements or the average electricity demand of around 6,500 three-person households) can be generated and at the same time up to 14,000 t of CO avoided each year. The German Energy Agency's Energy Efficiency Initiative rated the project as exemplary and awarded it the Best Practice Energy Efficiency label in 2015.

The Lünen site supplies its equipment and facilities with its own steam, primarily from smelting furnace waste heat and — if not enough waste heat is available — additional boilers using oil and gas. The steam generated is fed into the local network to cover process steam needs. Due to process-related fluctuations, the waste heat supply isn’t continuous. To handle this lack of continuity and reduce the use of fossil fuels, Aurubis AG plans to expand the steam infrastructure to include four gas storage facilities in the Lünen plant by mid-2025. This will enable an increase in waste heat use and an effective annual CO2 reduction of about 4,200 t.

Furthermore, the tankhouse overhaul will be completed in 2024. The existing tankhouse basins and the facility’s entire infrastructure have been modernized and/or optimized over the course of five years. The entire project requires a total of € 60 million and significantly improves energy efficiency at the Lünen site with an increase in throughput and cathode quality in electrolytic copper refining at the same time.

Aurubis considers the protection of biodiversity one of the major environmental challenges of our time. Therefore, biodiversity has also been one of Aurubis' environmental targets for several years. Since the plant site in Lünen is located only a few kilometers from several Natura 2000 nature conservation areas, it is important for the site to maintain and promote good conditions in the plant environment for species protection and biodiversity. As a matter of principle, the potential impact on biodiversity and the possibilities for promoting biodiversity are examined for every construction initiative or project.

The environmental management system at the Lünen site, which has been certified pursuant to EMAS and ISO 14001 since 1997, ensures that production and environmental protection targets are met, and that development opportunities can be optimally exploited. Together with the quality management system certified pursuant to ISO 9001, the energy management system certified pursuant to ISO 50001 since 2013, and the occupational safety management system certified pursuant to ISO 45001 since 2021, they form an integrated management system (IMS). The external audits carried out as part of the certification of the management system include a review of environmental data, compliance with legal requirements, and the effectiveness of operational processes.

Detailed environmental information on the Lünen site can be found in the current Environmental Statement.

Environmental Protection - facts & figures
Dust emissions

Dust emissions in g/t of input material and in g/t of copper equivalent

Dust emissions per ton of input material have been reduced by around 85 % since 2000.

Copper emissions

Copper emissions in g/t of copper produced

Copper emissions per ton of copper output have been reduced by about 89 % since 2000.

With cathode copper production more or less unchanged, metal production is generated from a high and increasing input of complex and low-copper recycling raw materials. The average copper content in the raw materials is decreasing, and the content of accompanying metals such as zinc, tin, nickel, gold and silver is increasing significantly. The increasingly complex composition of raw materials is becoming more energy-intensive to process.

Energy awareness is now incorporated into the regular qualification/instruction of employees. In particular, as a statement in the 2022 energy crisis, some energy-consuming equipment was switched off, such as lighting of outdoor facilities, provided this did not affect safety or environmental protection. An alternative to the natural gas supply was also planned in the shortest possible time due to the European war events in 2022 — the Lünen plant plans to commission an LPG facility in June 2024.

Environmental Protection Measures & Projects
Reducing emissions to air

Degree of implementation/date/next steps:

  • Assessment of the emission effects after closure of the smelting operations hall and, if necessary, closure of the KRS roof ventilation

Status: 

  • The project is in the basic engineering phase

Degree of implementation/date/next steps:

Implementation of the measures identified by drone measurements in the anode furnace area: sealing of Kesselhaus 7, spraying water on the roof in the casting area

Status: 

  • The measures were implemented and accepted by the authorities in 2021
Improvement of odor immissions in the plant surroundings

Degree of implementation/date/next steps:

  • New filter system installed in the sampling hall.

Status: 

  • Filter was constructed and commissioned in summer 2022.
Optimizing water flows

Degree of implementation/date/next steps:

  • Separate treatment of the remediation water and improvement of the ratio of utilized to discharged surface water close to 100 %

Status:

  • The previous goals have been achieved. An internal water use concept is currently being developed, which should completely avoid the discharge of unused process water.

Increasing energy efficiency

Degree of implementation/date/next steps:

  • Heat utilization and water quality of the anode smelter circuits and the leaching plant are being optimized to increase performance

Status:

  • Concepts are under development with external support. Projects are included in the investment budget

Degree of implementation/date/next steps:

  • Increasing the direct use of heat from waste heat: construction of a steam storage plant for optimized steam utilization. The steam storage facilities are intended to minimize energy losses and ensure an optimized supply of process steam to the boilers and plants.

Status: 

  • The project is currently being implemented.
  • Annual savings of 32,000 MWh of natural gas and 4,200 t of CO2

Degree of implementation/date/next steps:

  • Efficiency increase KRS

Status:

  • Annual savings of 36,400 MWh of oil and 10,000 t of CO2
Transition to the requirements of the Seveso III Directive

Degree of implementation/date/next steps:

  • Public disclosure

Status:

  • The documents are accessible on the internet, and the visitor and external company instructions have been revised. A general guideline on conduct and clothing regulations has been established for employees and external companies/visitors and are part of plant briefings.

Organizational improvements

Degree of implementation/date/next steps

  • Results improvement projects and project organization

Status: 

  • The system for the continuous improvement of procedures and processes (AOS) was merged organizationally with the Integrated Management System.
Environmental Protection milestones at Lünen site
2022-2024 New water concept for sustainable water use

As part of a new water concept, further improvements are planned with regard to sustainable water use. Further optimization of internal water use is planned for the coming years, including additional treatment of internal process water (reverse osmosis, evaporation). The goal is to use all water internally as far as possible and to completely avoid discharging process water into the public sewer system. Full realization of the project is scheduled for the end of 2025/beginning of 2026.

2022 Internationally recognized Copper Market quality seal

The Aurubis sites in Hamburg and Lünen have successfully completed the certification process by the Copper Mark and now bear the recognized seal of quality for sustainability in the copper industry. Since March 30, 2020, mines and smelters have been able to verify their sustainability performance on a voluntary basis and have it verified by third parties. Currently, more than 40 sites have joined the Copper Mark. A pilot project is currently underway with companies in downstream copper processing. The certificate for the Hamburg plant already includes this processing step. The 32 sustainability criteria of the Risk Readiness Assessment from the Responsible Minerals Initiative (RMI) on topics such as compliance, child labor, environmental protection, and occupational safety apply to the Copper Mark. It is aligned with the Sustainable Development Goals (SDGs), the United Nations framework. For the criterion of responsible sourcing of copper, lead, nickel and zinc, the Copper Mark has also developed a due diligence standard that also serves to meet the standards of the London Metal Exchange (LME), one of the world's most important metal exchanges, for responsible sourcing of metals. In addition to the Copper Mark, the Lünen site also bears the Zinc Mark and Nickel Mark quality labels.

2019 - 2024 Modernisation of refining electrolysis

The modernization of the tankhouse started in 2019. Aurubis AG has invested a total of € 60 million in the renewal of the plant over four years. The work has included the demolition and new construction of the tankhouse basins, and the efficiency improvement of the plant will increase the capacity by about 10 %. During the modernization in sections, the plant has remained in operation at 80 % capacity.

In April 2019, the tankhouse renewal project was initiated. The first phase was completed in early 2020.

In 2022, the entire roof ridge turret of the tankhouse was renewed during the overall renovation.

20215 Steam turbine

Commissioning of a two-stage steam turbine (5.7 MWel) to use up to 300,000 t of process steam for internal energy generation and use.

2014 Conversion of the mixed sewer system

Conversion of the plant's mixed sewer system into a separate sewer system (operational wastewater, sanitary water, and rainwater) in connection with rainwater retention and collection (RAN system, 9,000 m3 retention volume). This enables the use of collected rainwater as internal process water for cooling processes and thus a savings of more than 100,000 m3 of water drawn from the public supply.

2013 Closure and suctioning of the smelter hall

Complete closure and suctioning of the smelter hall. As a result of this measure, the entire melting processes of the Lünen plant, from the bath melting furnace to the anode furnace, including the halls for transport and charging, have been completely suctioned off. Emissions from the site have thus been minimized far beyond the state of the art.

2011 KRS+

Commissioning of a converter furnace (TBRC) as part of the KRS+ efficiency project. As a result of this process technology improvement, the Lünen site was able to increase its throughput by more than 30 % while maintaining the same overall primary energy input for the plant.

2011 Truck tire washing system

Installation of a truck tire washing system, which all delivery vehicles must pass through before leaving the factory, to further minimize dust emissions from the factory.

2010 Noise protection barrier

Construction of a noise protection barrier at the material delivery in the southern area of the plant to reduce noise emissions from delivery traffic to the adjacent properties.

2002 Kayser Recycling System (KRS)

Implementation of the Kayser Recycling System (KRS) in the course of the plant modernization after the takeover by Aurubis AG (then Norddeutsche Affinerie AG). Commissioning of a highly efficient ISA bath melting furnace and a tin composite furnace with state-of-the-art filter technology to replace the site's old shaft furnaces.

Information to the public in accordance with the Major Accidents Ordinance